Upgrading 33 sets of toilet is a major task, not only in the design but the management aspect as well. With the given time limit of 6 months, time management is very crucial. The scope of the commercial toilet design works includes: hacking off the existing toilet, replacement of all toilet fixtures, tiles, plumbing and electrical works.
Quality control of the commercial toilet design is heavily undertaken and carried out throughout the entire duration. We made sure all elements like the mechanical, plumbing and structural aspects are all checked and properly executed. Design is our forte but functionality is still our top priority.